Study Flow, Short circuit, Protection coordination, Arc flash and Harmonic studies.

Industry: Steel

Location: San Martin Texmelucan, Mexico

Supply voltage level: 115 kV

Improvement made: Overcurrent and transformer differential overcurrent relay tests were performed, detecting that there was no adequate coordination for the protection of power cables. We proposed a E-SCADA system for an accurate monitoring.